Fulcrum's impressive list of clients and projects spans a wide variety of building types and business sectors. These projects represent the broad range of Fulcrum's technical experience and capture just some of the many success stories of the prestigious institutions that have benefited from the high level and quality of service provided by the Fulcrum team. The common theme across all of these engagements is the realized benefits of having a focused technical advocate on your team. This advocacy will ensure that the complex building systems being counted on to support the mission-critical business of your facilities will function as required and will do so as efficiently as possible. As you read through these brief case studies you will note the challenges presented by the projects and the innovative solutions provided by the Fulcrum team to enable these distinctive projects to be successfully implemented.
Bank of America Tower at One Bryant Park
Services we are providing for OBP:
- -Commissioning of the Core & Shell Systems
- -Fulfilling the LEED CS prerequisite and additional commissioning requirements
- -On-site owner's technical representative
- -Hydronic system flow modeling and equipment sizing
- -Measurement and Verification Plan Development
- -Combined Heat and Power Plant Program Oversight
OUR CONTRIBUTIONS TO OBP
Regarding the Combined Heat and Power Plant:
- -In collaboration with the design team, identified the financial, sustainable, and logistical, benefits of a CHP plant over a combined cycle plant
- -Continued technical assistance that ensures the owner's vision for advanced clean power technology will result in financial, performance, and sustainable operational realities
- -An installation that is accessible and serviceable by the operating staff within the limited space constraints
- -Operators that are confident of the plant operation by way of rigorous training and hands-on involvement in the performance testing and turnover process.
Regarding the chilled water Plant:
- -Flow modeling to impose equal chiller differential pressure (and therefore flow) without balancing valves
- -Elimination of check valves at chilled water and condenser water pumps
- -Optimized chiller capacity during operation through right-sized chillers
- -Flexibility of primary flow control to reduce the number of pumps and therefore footprint
- -Identification of the energy savings and operational benefits of primary-secondary over variable primary
- -Factory test validation for the chillers with test points specific to the needs of One Bryant Park
- -Assurance that the chillers are accessible for maintenance, break-down, and reassembly after installation
- -Flow metering and management scheme that will realize the full potential of the plant along with the selection of metering equipment that can perform to that expectation
- -A condenser water system that has flush capability
- -Chillers with marine boxes and access enhancements